Telangana solar subsidy, net metering and cost

State subsidyCentral up to ₹78,000. No state top-up found.
DISCOMTGSPDCL (Hyderabad and south), TGNPDCL (north)
Last verifiedNovember 18, 2026
Short answer

Telangana homes can claim the central PM Surya Ghar subsidy of up to ₹78,000. We did not find a separate state subsidy. TGSPDCL has dropped feasibility studies for systems up to 10 kWp and waived the application fee for registrations from 22 June 2026 to 31 March 2027, subject to conditions.

Telangana homes can claim the central PM Surya Ghar subsidy of up to ₹78,000. We did not find a separate state subsidy in the reports we read in November 2026. What the main distribution company has done instead is cut paperwork. This page explains the central subsidy, the company’s simplified process and fee waiver, progress so far, and what to check before you pay a vendor.

Subsidies for homes in Telangana

Central subsidy (PM Surya Ghar): ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for systems of 3 kW or more. For housing societies and resident welfare associations the central subsidy is ₹18,000 per kW for common facilities, up to 500 kW.

State subsidy: a Deccan Chronicle report of 10 October 2026 on the state’s rooftop push describes only the central subsidy and the distribution company’s measures. If a vendor quotes a Telangana top-up, ask for the official order.

Which company supplies your power

Telangana has two distribution companies. TGSPDCL serves Hyderabad and the southern districts, and TGNPDCL serves the north. Your bill shows which one is yours. The October 2026 report covers TGSPDCL.

What TGSPDCL has simplified

  • Its portal is integrated with the national PM Surya Ghar portal.
  • No technical feasibility study for systems up to 10 kWp.
  • Automatic load enhancement, with the charges collected through later bills.
  • A streamlined inspection, and an exemption from certain documents, including the net-metering agreement.
  • No application fee for systems up to 10 kWp registered between 22 June 2026 and 31 March 2027, subject to conditions.
  • A monthly meeting with solar vendors on the first Wednesday.

Progress so far

As of 9 October 2026, TGSPDCL reported 44,662 registrations under PM Surya Ghar and 29,816 installations, with a capacity of about 125.6 MW. Its separate net-metering category showed 30,259 registrations and about 640.9 MW. These are company figures for TGSPDCL’s area only.

How to apply

  1. Register at the national portal with your mobile number and electricity connection details.
  2. Select your distribution company and submit the application.
  3. After approval, install through a registered vendor. Compare quotes with our quote checklist.
  4. Complete net metering, inspection and commissioning, and submit the details on the portal. The subsidy is credited to your bank account after verification.

What to check before you buy

  • The vendor is registered on the national portal and the panels meet the domestic-content rule.
  • You know whether the application fee waiver applies to your registration date.
  • You receive the commissioning certificate before the final payment.

Farm and pump solar is a different scheme

Solar pumps and farm solar fall under separate schemes such as PM-KUSUM, not the residential rooftop scheme described here.

Solar savings in Telangana

₹3,000
Suggested system–
Approx. cost–
Central subsidy–
Payback time–
Net savings over 25 years–
CO₂ avoided per year–
Get notified when quotes open

Estimates only: ₹55,000 per kW, 4 units per kW per day, ₹7 per unit, 0.7% yearly drop in output. Savings are rounded. Subsidy follows PM Surya Ghar; check current rules.

Frequently asked questions

Does Telangana give a state subsidy on top of PM Surya Ghar?

We did not find one. The reports we read describe the central subsidy and TGSPDCL's simplified process. Ask your company for the official order before you count on any top-up.

Which company supplies electricity in Telangana?

TGSPDCL serves Hyderabad and the southern districts and TGNPDCL serves the north. Your bill shows which one.

Is there an application fee?

TGSPDCL has waived it for systems up to 10 kWp registered between 22 June 2026 and 31 March 2027, subject to conditions.

Do I need a feasibility study?

Not for systems up to 10 kWp in TGSPDCL's area, according to an October 2026 report.