Net metering for rooftop solar in India: how it works
Net metering lets your rooftop solar system export surplus power to the grid through a two-way meter, and you are billed only on net units (imports minus exports). Credits carry forward within the settlement year, usually 1 April to 31 March, and unused credit at year end is paid at a low rate set by the regulator, so size the system for your own use. Under the national rules, systems up to 10 kW need no feasibility study and the DISCOM must commission within 15 days.
Net metering is the arrangement that lets your rooftop solar system send surplus power to the grid and get credit for it on your electricity bill. It is what turns a rooftop system from panels that only help in the daytime into a bill that falls sharply. This guide explains how it works in plain words, how it differs from net billing and gross metering, what happens to units you do not use, how to get a net meter, and what changed in Delhi in July 2026. Rules last checked on 13 November 2026.
How net metering works
Your panels power your home first. Anything they produce beyond what you are using flows to the grid through a two-way (bi-directional) meter, which records the units you import from the electricity company (DISCOM) and the units you export to it. Your bill is based on the net units: imports minus exports.
Illustration only, using units and not rupees. In one month your system generates 360 units. You use 200 of them directly and export 160. Your home uses 450 units in total, so you import 250 from the grid.
| Item | Units |
|---|---|
| Solar generated | 360 |
| Used directly from the panels | 200 |
| Exported to the grid | 160 |
| Home’s total use | 450 |
| Imported from the grid | 250 |
| Billed units (imports minus exports) | 90 |
Fixed charges and any minimum charge your DISCOM applies are separate from the units, so the bill rarely falls to exactly zero. To estimate your own figures, use our solar calculator.
Net metering, net billing and gross metering
These three terms are often mixed up. A Centre for Social and Economic Progress (CSEP) analysis describes them like this:
| Model | How your exports are treated |
|---|---|
| Net metering | Exports offset your later imports unit for unit. |
| Net billing | You are billed for all imports, and exports are bought by the DISCOM at a fixed tariff that is lower than the retail rate. |
| Gross metering | All your solar output is sold to the DISCOM at a fixed tariff, and you buy all your power at the normal retail rate. |
In CSEP’s simulations, which use Gujarat tariffs and stated assumptions, net metering gave the fastest payback for a household (4 to 5 years), net billing was slower (6 to 9 years) and gross metering took over 20 years unless the fixed tariff was high. Your own result will differ, but it shows why the metering rule matters as much as the subsidy. Households in the three states this site covers, Delhi, Haryana and Uttar Pradesh, can use net metering under their current rules, but regulators can and do revise them, so check with your DISCOM.
What happens to surplus units
- Month to month: if you export more than you import, the extra units are normally carried forward as credit to the next bill.
- Settlement year: credits are usually settled over a financial year, 1 April to 31 March. States set their own rules, so confirm yours.
- At year end: credit that you have not used is not paid at the full retail rate. The regulator sets a lower rate. CSEP cites Gujarat’s ₹2.25 per unit in 2024-25 as an example. Other states, and the same state in other years, differ.
The practical lesson is to size your system for your own use, not for the maximum export. A system that regularly produces far more than you use builds credit that is worth less at year end. Your sanctioned load also usually limits the system size, so if you plan a larger system, ask your DISCOM about a load increase before you order.
How to get a net meter, step by step
- Check your connection. Your bill shows your DISCOM, consumer number and sanctioned load. The system generally cannot be larger than your sanctioned or connected load.
- Apply. If you want the central subsidy, apply on the national PM Surya Ghar portal, which also carries the net metering process; see our step-by-step subsidy guide. Other applicants use their DISCOM’s or state’s solar portal.
- Technical feasibility. The DISCOM checks that its local network can take your system. For systems up to 10 kW, the national rules treat a complete application as feasible without a separate study.
- Installation. A registered vendor installs the system to the required standards.
- Inspection and net meter. The DISCOM inspects the system, tests and installs the bi-directional meter, and activates the connection.
- Agreement. Some states now accept this online or have waived it for small systems. Read what you are agreeing to before you accept.
- Check your first bill. It should show units imported, units exported and net units. If it shows only one reading, contact your DISCOM, because the meter may not be set up for export.
How long it should take
- National rules: under the amended Electricity (Rights of Consumers) Rules, systems up to 10 kW do not need a technical feasibility study, and the DISCOM must commission a rooftop system within 15 days. Studies for larger systems must be finished within 15 days.
- Delhi, since July 2026: the process now has two stages. The DISCOM has 15 days for feasibility, and silence counts as approval. After installation it has 10 days to verify documents, inspect, fit the meter and activate. For systems up to 10 kW the total DISCOM time is up to 10 days, and above 10 kW up to 25 days, not counting the time you take to answer questions. If documents are missing, the DISCOM must send a single consolidated notice, you get 15 days to fix them, and it then has 5 days to finish.
- Elsewhere: these are legal targets. Real timelines depend on your DISCOM, so ask for the application date and keep screenshots of the portal status.
Rules in Delhi, Haryana and Uttar Pradesh
- Delhi: the Delhi Electricity Regulatory Commission’s Net Metering (Second Amendment) Guidelines, 2026, took effect on 16 July 2026 and also apply to pending applications. Everything is online. Domestic systems up to 10 kW pay no application or registration fee, and these consumers can accept the connection agreement electronically. PM Surya Ghar applicants use the national portal.
- Haryana: the Haryana Electricity Regulatory Commission amended its rooftop solar regulations by a final order of 30 October 2025. A draft proposed paying year-end surplus at 75 per cent of the last SECI tariff or a reference rate; confirm the final figure with your DISCOM. In September 2026 a rooftop solar user challenged how credits are set off against retail charges, and the regulator dismissed his petition on procedural grounds without ruling on the question.
- Uttar Pradesh: in August 2025 the regulator waived application and registration fees, the interconnection agreement and net-meter testing fees for consumers with sanctioned loads up to 10 kW. A March 2026 draft amendment with a state charge above 5 kW has been reported, and we have not confirmed that it became law. Check before you rely on it.
Costs and fees
For domestic systems up to 10 kW, Delhi exempts application and registration fees, and Uttar Pradesh waived several. The rest depends on your DISCOM. Ask three things in writing: what the DISCOM charges, who supplies and pays for the bi-directional meter, and whether the meter test is included in your vendor’s price. In some areas the consumer can buy the meter and present it for testing, and in others the DISCOM supplies it.
Questions to ask before you sign
- What system size does my sanctioned load allow?
- Is the system sized to my own use, or to export?
- Who files the net metering application, who pays any DISCOM fees, and who supplies the meter?
- What is the year-end rate for unused credit in my state?
- Will the meter be easy for DISCOM staff to reach?
This guide is for information only. Metering rules and rates change, so confirm them with your DISCOM before you order a system. See our disclaimer and how we verify our numbers.
Frequently asked questions
What is net metering in simple words?
It is a billing arrangement where the units your rooftop solar sends to the grid are deducted from the units you take from it, so you pay only for the net difference.
Will my electricity bill become zero with net metering?
It can fall sharply, but fixed charges and any minimum charge set by your DISCOM are billed separately, so the bill rarely reaches exactly zero.
What happens to the extra units I do not use?
They are normally carried forward as credit within the settlement year. Credit left at year end is paid at a rate fixed by the regulator, which is lower than the retail rate and differs by state.
Do I need a new meter for net metering?
Yes, a bi-directional meter that records imports and exports. Who supplies and pays for it varies by DISCOM and area, so ask in writing before you order.
How long does net metering take to get?
The national rules require the DISCOM to commission a rooftop system within 15 days. In Delhi, since July 2026, DISCOM time is up to 10 days for systems up to 10 kW and up to 25 days above that, excluding your response time. Real timelines vary.
Is net metering the same as the PM Surya Ghar subsidy?
No. The subsidy is a one-time payment from the central government. Net metering is how your bill is calculated afterwards. For subsidised homes the net metering steps run through the same national portal application.
Can I install any size of system?
Usually the system cannot be larger than your sanctioned or connected load, so ask your DISCOM about a load increase before you order a bigger system.
Sources
- CSEP: When the sun meets the meter, rooftop balance (Jun 2025)
- SolarQuarter: DERC net metering guidelines 2026 (20 Jul 2026)
- Energetica India: DERC simplifies rooftop net metering process
- Drishti IAS: amended Electricity (Rights of Consumers) Rules (Mar 2024)
- Mercom India: Haryana draft amendment to rooftop solar rules (Aug 2025)
- SolarQuarter: HERC dismisses rooftop solar review petition (24 Sep 2026)
- Saur Energy: UP approves waivers for new rooftop solar consumers (Aug 2025)
- QuickEstimate: UPPCL net metering guide (updated Oct 2026)