PM Surya Ghar subsidy: how to apply online, step by step

By admin · Updated November 12, 2026 · Facts checked November 12, 2026 · How we check

Short answer

Register on the national PM Surya Ghar portal with your state, electricity company (DISCOM) and consumer number, apply for rooftop solar, choose a registered vendor, and get the system installed and inspected. Then redeem your subsidy by submitting bank details. The central subsidy is up to ₹78,000: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. It is paid after commissioning, so you fund the system first.

The PM Surya Ghar: Muft Bijli Yojana pays a central subsidy of up to ₹78,000 to households that put solar panels on their own roof. Applying is done online, but the process has several hand-offs between you, your installer and your electricity company, and that is where most delays happen. This guide walks through every step in order, shows who is responsible at each stage, and lists the places where applications usually get stuck. Rules last checked on 12 November 2026.

By 5 August 2026 the Ministry of New and Renewable Energy (MNRE) reported more than 50 lakh rooftop installations under the scheme, so the process is well tested. It is not instant, though, and the steps below matter.

How much subsidy you can get

The central subsidy depends only on the size of the system you install. For most states and union territories it is:

System size Central subsidy
1 kW ₹30,000
2 kW ₹60,000
3 kW or larger ₹78,000 (the maximum)

The rate is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. Anything above 3 kW gets no extra central subsidy. Special-category states and union territories have higher rates. Some states add their own subsidy on top; see our pages for Delhi, Haryana and Uttar Pradesh, or use the solar calculator to size a system for your bill.

Housing societies and resident welfare associations (RWAs) can also claim for common facilities such as lifts, lights and pumps, at a lower rate per kW, with a limit of 3 kW per household and 500 kW in total.

Important: the subsidy is paid to your bank account after the system is installed, inspected and commissioned. You pay the installer first, from savings or a loan, and the subsidy comes back later. Illustration only, not a price benchmark: if a 3 kW quote were ₹2,00,000, you would pay ₹2,00,000 up front, receive ₹78,000 afterwards, and your net cost would be ₹1,22,000 before any state subsidy.

Who can apply

  • An Indian citizen who owns a house with a roof suitable for solar panels.
  • A household with a valid, active electricity connection in its name.
  • A residential consumer. Rural households are included.
  • Someone who has not already taken a rooftop solar subsidy on the same connection. If you already have a subsidised system, ask before expanding, because the portal has separate rules for that.

What to keep ready before you start

  • Your electricity bill, for the consumer number, the name of your electricity company (DISCOM) and your sanctioned load.
  • A mobile number and email address you can access, because both receive OTPs.
  • Your Aadhaar details. Aadhaar authentication is required before the subsidy is paid.
  • Bank account details and a cancelled cheque, passbook scan or bank statement. The name must match the account holder who will claim the subsidy.
  • A rough idea of your shadow-free roof area. As a rule of thumb, installers often allow 8 to 10 square metres per kW, but yours will measure.

The application process, step by step

  1. Register on the national portal. Go to the official PM Surya Ghar portal, pmsuryaghar.gov.in, choose “Apply for Rooftop Solar”, and enter your state, DISCOM, consumer number, mobile number and email. Verify with the OTP. You act.
  2. Submit the rooftop solar application. Select the rooftop solar application, enter your state, district, DISCOM and consumer number, and fetch your connection details before you fill in the form. You can also let a registered vendor fill it in for you, but check every detail yourself. You act.
  3. Feasibility check. For systems up to 10 kW, the amended Electricity (Rights of Consumers) Rules say a complete application is accepted without a technical feasibility study. Your state or DISCOM may still handle this step in its own way, so watch the portal status rather than assuming. The DISCOM acts.
  4. Choose a registered vendor. Only vendors listed on the portal can do work that qualifies for the subsidy. Compare at least three written quotes, and read the checks in the section below before you pay anyone. You act.
  5. Installation. The vendor installs the system to the scheme’s technical and safety specifications and uploads the installation details, including geo-tagged photos. The vendor acts.
  6. Net metering and inspection. The DISCOM inspects the system, installs the net meter and completes the net-metering agreement under your state’s rules. The Ministry of Power’s rules say the DISCOM must commission a rooftop system within 15 days. Fees for net metering and commissioning should be displayed on the DISCOM’s website. The DISCOM acts, and you may need to sign.
  7. Commissioning. Once the DISCOM’s approval is recorded, the system is marked as commissioned on the portal. Download the commissioning report or certificate if the portal offers one, and keep it. The DISCOM and the portal act.
  8. Submit your bank details. After the DISCOM’s approval, an e-token with your eligible subsidy amount is activated on your portal profile. Redeem it by entering verified bank details and the cancelled cheque. You act.
  9. Receive the subsidy. The subsidy is transferred directly to your bank account. The portal acts.

Who does what, and when money moves

Stage Your money Your paperwork
Registration and application Nothing Application ID
Vendor selection and booking Advance, if you agree to one Written quote and agreement
Installation Balance, as agreed in writing Geo-tagged photos, invoice, warranty cards
Inspection and net meter Any DISCOM fees Net-metering agreement
Commissioning Nothing Commissioning certificate
Subsidy redemption Subsidy comes in Bank proof, e-token receipt

How long it takes

Official targets exist for individual steps, but no national figure is published for the whole process, so do not plan around a fixed date.

  • DISCOM commissioning of a rooftop system: 15 days under the amended Rights of Consumers Rules, down from 30.
  • Subsidy after approval: reports citing the MNRE guidelines say the subsidy is processed within about 15 days of the DISCOM’s approval, provided verification and documents are complete. An earlier government explainer from 2024 said within 30 days of submitting bank details. Treat both as targets, not guarantees.
  • Everything in between depends on your DISCOM and your vendor.

Seven places where applications get stuck

  1. The DISCOM approved offline but the portal shows nothing. UPPCL representatives told Saur Energy in 2024 that many inspection reports awaiting approval were not showing on the portal even after offline approval. If your status has not changed, ask the DISCOM office to confirm in writing that it has been uploaded.
  2. The e-token was never redeemed. Approval does not pay the subsidy. You must submit your bank details yourself.
  3. Wrong or unclear bank details. Use a clean cancelled cheque or passbook scan, and make sure the account is active and in the claimant’s name.
  4. Installed capacity differs from the sanctioned capacity. If the vendor installs more or less than you applied for, the claim can be held up. Agree the capacity in writing first.
  5. Aadhaar authentication not completed. The subsidy is not released until it is done.
  6. Loan account first. If you took a scheme loan, the subsidy may go to the loan account first. Ask your bank how it is applied.
  7. Portal notices and rule changes. Log in and read your notifications every week, not only when something is due.

Checks before you pay a vendor

  • Search for the vendor on the national portal’s list of registered vendors. Confirm the name and registration details match the quote.
  • Get the capacity, panel make and model, inverter make and model, wire and earthing details, and warranty terms in writing.
  • Agree a payment schedule that releases the final instalment after commissioning, not before. This is our suggestion, not a scheme rule.
  • Ask who handles the net-metering paperwork and DISCOM fees, and what it costs.
  • Ask for the maintenance terms in writing. Promised maintenance that never happens is one of the vendor violations MNRE lists.

If something goes wrong, MNRE’s June 2026 complaint procedure covers non-compliant equipment, unsafe wiring or earthing, delays after taking your payment, missing maintenance and obstruction of inspectors. Complaints are filed through the portal’s grievance management system. The vendor is given time to respond, and a vendor that does not can have its portal account deactivated. Keep your quotes, receipts, photos and messages.

Loan option

The scheme also facilitates collateral-free loans for rooftop systems up to 3 kW at around 7 per cent interest, according to a Business Today report of May 2026. Rates and terms differ by bank, so ask for the current figures and check how the subsidy will be adjusted against the loan.

What to do next

  1. Check your last six bills and size your system with the solar calculator.
  2. Read the page for your state, because some states pay extra and each DISCOM has its own steps.
  3. Register on the national portal and start the application before you book a vendor.

This guide is for information only. Subsidy rates, rules and portal steps can change, so confirm them on the official portal before you pay for anything. See our disclaimer and how we verify our numbers.

Frequently asked questions

How much subsidy does PM Surya Ghar give for a 3 kW system?

Up to ₹78,000 from the central government in most states: ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third kW. Special-category states have higher rates, and some states add their own subsidy.

Do I pay the full price before I get the subsidy?

Yes. The subsidy is paid to your bank account after the system is installed, inspected and commissioned, so you pay the vendor first from savings or a loan.

How long does the PM Surya Ghar subsidy take to arrive?

Reports citing MNRE guidelines say about 15 days after the DISCOM approves the installation, and an earlier government explainer said within 30 days of submitting bank details. No national average is published, so treat these as targets, not guarantees.

Can I choose any installer?

No. For the subsidy, use a vendor registered on the national portal. Check the vendor against the portal's list before you pay.

Does my application need a technical feasibility study?

For systems up to 10 kW, the amended Electricity (Rights of Consumers) Rules say a complete application is accepted without a technical feasibility study. Your DISCOM may still follow its own process, so watch the portal status.

What if my vendor does not complete the work after taking my payment?

Complain through the grievance management system on the national portal. MNRE's June 2026 procedure covers delays after payment, unsafe wiring and missing maintenance, and a vendor that does not respond can be deactivated. Keep your quote, receipts and messages.