Delhi solar subsidy 2026: how much you get

By admin · Updated November 16, 2026 · Facts checked November 13, 2026 · How we check

Short answer

A Delhi household can get the central PM Surya Ghar subsidy of up to ₹78,000 plus a Delhi top-up of up to ₹26,000 per kW, capped at ₹78,000, so up to ₹1,56,000 combined for a 3 kW system. The Delhi amount is the lower of the tender-discovered cost minus the central subsidy and ₹26,000 times your capacity, so it can be smaller. The two are claimed separately, so ask your vendor to file both.

Delhi households can now get two subsidies on a rooftop solar system: the central PM Surya Ghar subsidy of up to ₹78,000 and a Delhi government top-up of up to ₹78,000 for a 3 kW system. That is up to ₹1,56,000 combined. The state top-up was raised in 2026, it has a few conditions, and it is claimed separately from the central one. This guide explains how much you can get at each size, the rule that can make the Delhi amount smaller, what changed for housing societies, and how to claim both. Rules last checked on 13 November 2026.

How much you can get

The Delhi Solar Energy Policy was amended in 2026. Delhi now pays up to ₹26,000 per kW for residential systems up to 3 kW, with a maximum of ₹78,000. The amendment is reported to take effect from its gazette notification, dated 17 September 2026. Before that, Delhi’s top-up was ₹10,000 per kW, capped at ₹30,000 for a 3 kW system.

System size Central subsidy Delhi top-up (up to) Combined (at most)
1 kW ₹30,000 ₹26,000 ₹56,000
2 kW ₹60,000 ₹52,000 ₹1,12,000
3 kW ₹78,000 ₹78,000 ₹1,56,000
Above 3 kW (up to 10 kW) ₹78,000 No extra ₹1,56,000

The 1 kW and 2 kW Delhi figures are our arithmetic from the per-kW rate. A system larger than 3 kW gets no additional Delhi subsidy, so size it for your use and not for the subsidy; our solar calculator helps with that.

Why you may get less than the maximum

The words “up to” matter. According to a summary of the amended policy, the Delhi subsidy is the lower of two amounts:

  • the tender-discovered project cost minus the central subsidy, or
  • ₹26,000 multiplied by your eligible capacity, within the ₹78,000 cap.

The central and state subsidies together also cannot exceed the project cost. The policy summary gives two examples for a 3 kW system with a ₹78,000 central subsidy:

Project cost Delhi pays You pay
₹1,50,000 ₹72,000 Nothing
₹1,75,000 ₹78,000 ₹19,000

So the lower your project cost, the less Delhi adds. Compare quotes in our 3 kW cost guide, and confirm on the Delhi solar portal how the cost limit is applied to your project.

Generation-based incentive

Delhi’s older scheme paid households a per-unit incentive for the power they generated. For new residential installations under the amended policy, that incentive is discontinued and replaced by the upfront subsidy above. Existing domestic consumers who already receive it keep it. Commercial and industrial consumers keep their five-year incentive.

Housing societies and RWAs

Resident welfare associations and group housing societies can claim for common facilities, including EV charging. Delhi pays ₹11,000 per kWp, up to 500 kWp per project, with a reference of up to 3 kWp per house. The policy sets a target of 66 MW, allocated first come, first served. Add the central RWA subsidy of ₹18,000 per kW, and the combined figure is ₹29,000 per kW for qualifying common-area systems. One installer guide adds that RWA projects need domestic-content panels and a society resolution approving the installation, so check this with your vendor.

How to claim both subsidies

  1. Register and apply on the national portal for the central subsidy. Our step-by-step subsidy guide covers this.
  2. Ask about the Delhi application. One installer guide says the Delhi top-up needs a separate application on the Delhi Solar Portal (solar.delhi.gov.in) and warns that some installers file only the central form. Ask your vendor in writing which portals they will file on, and get the Delhi application number.
  3. Keep your documents ready. Typically these are your Aadhaar, a recent electricity bill, a cancelled cheque or passbook, a photograph, roof photos and proof of ownership.
  4. Install and get the net meter. Delhi’s net metering process was simplified in July 2026; see our net metering guide.
  5. Track both payments. The central subsidy and the Delhi top-up are paid separately, so watch both applications.

Timelines vary. One installer guide estimates about 30 to 45 days from survey to commissioning, the central subsidy within about 30 days of commissioning, and the Delhi top-up 45 to 60 days after that. These are vendor estimates, not official promises. Most of Delhi is served by BSES Rajdhani, BSES Yamuna or Tata Power-DDL.

Questions to ask before you pay

  • Will you file both the central and the Delhi applications, and on which portals?
  • What Delhi subsidy do you expect for my project cost, and how is it worked out?
  • Do the panels meet the domestic-content rule that applies from 1 June 2026?
  • Is the Delhi subsidy deducted from your quote, or paid to me later? A subsidy is paid to you, so a price that already deducts it needs a clear written explanation.

For the page covering Delhi’s net metering, tariffs and local rules, see solar in Delhi. This guide is for information only. Subsidy amounts, caps and rules change, so confirm them on solar.delhi.gov.in and pmsuryaghar.gov.in before you pay for anything. See our disclaimer and how we verify our numbers.

Frequently asked questions

How much is the Delhi solar subsidy in 2026?

Up to ₹26,000 per kW for residential systems up to 3 kW, with a maximum of ₹78,000. It is paid on top of the central PM Surya Ghar subsidy of up to ₹78,000.

What is the total subsidy for a 3 kW system in Delhi?

Up to ₹1,56,000 (₹78,000 central plus up to ₹78,000 from Delhi), but the Delhi part can be lower depending on the project cost.

Does Delhi give extra subsidy above 3 kW?

No. According to the policy summary there is no additional Delhi subsidy for capacity above 3 kW up to 10 kW. The central subsidy is also capped at ₹78,000.

Why might I get less than the maximum Delhi subsidy?

The Delhi subsidy is the lower of the tender-discovered cost minus the central subsidy, or ₹26,000 times your capacity. The central and Delhi subsidies together also cannot exceed the project cost.

Is the generation-based incentive still available in Delhi?

For new residential installations it is discontinued and replaced by the upfront subsidy. Existing domestic consumers who already get it keep it.

What do housing societies get in Delhi?

Delhi pays ₹11,000 per kWp for common facilities, up to 500 kWp per project. With the central ₹18,000 per kW, that is ₹29,000 per kW for qualifying systems.

Do I apply separately for the Delhi subsidy?

One installer guide says yes, on the Delhi Solar Portal, and that some installers file only the central form. Ask your vendor in writing which portals they will use.

Sources

Get updatesWhatsApp