Short answer

Karnataka homes can claim the central PM Surya Ghar subsidy of up to ₹78,000. We found no separate state subsidy for residential rooftop systems. The state regulator KERC issued a new solar tariff order on 25 August 2026, so confirm current net metering terms with your distribution company.

Karnataka homes get the central PM Surya Ghar subsidy. We found no separate state subsidy for residential rooftop solar. The state regulator, KERC, issued a new solar tariff order in August 2026, and its rooftop rules were being rewritten during 2026. This page explains what we found, which of the five distribution companies serves you, and how to apply. We read news reports and regulator material in November 2026. Confirm the current rules with your distribution company before you buy.

Subsidies for homes in Karnataka

Central subsidy (PM Surya Ghar): ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for systems of 3 kW or more.

Karnataka state subsidy: a July 2026 guide, last updated in October 2026, says Karnataka does not provide a separate state top-up for residential rooftop systems, and a vendor comparison of state schemes lists none either. The state solar water heater subsidy and PM-KUSUM farm pump support are separate programmes. State policy can change, so ask your distribution company and the state renewable energy agency, KREDL, whether anything new has launched.

Which company supplies your power

Karnataka has five distribution companies. Apply through the one that serves your address:

  • BESCOM: Bengaluru urban and rural, Tumakuru, Chitradurga, Davangere, Ramanagara, Kolar and Chikkaballapura.
  • MESCOM: Mangaluru and the coastal and Malnad districts, including Dakshina Kannada, Udupi and Shivamogga.
  • HESCOM: Hubballi, Dharwad and most of north-western Karnataka.
  • GESCOM: Kalaburagi, Bidar, Raichur, Ballari and Koppal.
  • CESC Mysore: Mysuru, Mandya, Hassan and Chamarajanagar.

Net metering and the 2026 rule changes

  • Tariff order of 25 August 2026. KERC issued a new order valid until 30 June 2029, extending its earlier order until 24 August 2026 so there was no gap. Reported levelised rates for distributed solar include ₹3.89 per unit for non-subsidised domestic systems of 1 to 10 kW, and for homes under PM Surya Ghar ₹1.96 per unit for 1 to 2 kW, ₹2.14 per unit above 2 kW up to 3 kW, and ₹2.58 per unit above 3 kW. We could not confirm exactly how these rates apply to the surplus a net-metered home exports, so check the order or ask your distribution company.
  • Virtual and group net metering. KERC’s 2025 order introduced virtual net metering, where one plant supplies several connections in a distribution area, and group net metering, where one consumer offsets generation across their own connections. The 2026 order sets their tariff at 75% of the standard non-domestic tariff. Both have a minimum plant size of 5 kW.
  • Draft regulations. In June 2026 KERC proposed new Distributed Solar PV regulations to replace its 2016 rooftop rules. As drafted, immediate installation after application would be allowed up to 150 kW, utility inspection and commissioning would be due within five working days, and storage would be needed above 10 kW. We could not confirm whether the final version has the same terms.

How to apply

  1. Register on the national PM Surya Ghar portal using the consumer account number from your bill.
  2. Enter your details and upload your documents: electricity bill, Aadhaar, proof of roof ownership and a cancelled cheque.
  3. Choose a vendor empanelled with your distribution company and sign the installer agreement.
  4. Wait for feasibility approval before you start installation. Starting early can put the subsidy claim at risk.
  5. After installation your distribution company fits a net or smart meter, inspects the system and issues a commissioning certificate. Upload it to claim the subsidy.

What to check before you buy

  • The vendor is empanelled with your distribution company.
  • Your bank account is linked to Aadhaar so the subsidy transfer does not fail.
  • The quote names the panel brand and wattage, the inverter, the warranty, and who handles the paperwork.
  • You receive the net meter and commissioning certificate before you make the final payment.

Frequently asked questions

Does Karnataka give a state solar subsidy?

We found no separate state subsidy for residential rooftop solar. Homes get the central PM Surya Ghar subsidy. Ask your distribution company or KREDL whether anything new has launched.

Which company supplies electricity in Karnataka?

BESCOM, MESCOM, HESCOM, GESCOM or CESC Mysore, depending on your district. Your bill shows which one serves you.

Can I share one solar plant across several connections?

Karnataka allows virtual net metering and group net metering, each with a minimum plant size of 5 kW. Ask your distribution company for the current terms.

Should I start installation before approval?

No. Wait for feasibility approval from your distribution company, because starting early can lead to the subsidy claim being rejected.