How to compare rooftop solar quotes in India: a checklist

By admin · Updated November 18, 2026 · Facts checked November 18, 2026 · How we check

Short answer

Compare at least three itemised written quotes from vendors registered on the PM Surya Ghar portal, and divide each by its panel capacity in kWp to get a price per kWp. Check that each names the panels and inverter, states domestic-content (ALMM) panels, shows GST separately, says who handles net metering, and promises five years of maintenance in writing. Be wary of "subsidy included" prices and full payment before installation.

A rooftop solar quote that leaves things out can cause trouble months later: who handles the net meter, how long the maintenance lasts, whether the panels qualify for the subsidy. Under PM Surya Ghar there is no fixed government price, so the quote is the contract in all but name. This guide gives you a checklist to read a quote line by line, the minimum standards the scheme itself sets for vendors, the warning signs, and a table you can copy to compare three vendors side by side. Rules last checked on 18 November 2026.

What the scheme itself requires of a vendor

The Ministry of New and Renewable Energy’s operational guidelines for PM Surya Ghar (7 June 2024) set a floor that every vendor must meet. You can use these points to test any quote, because a vendor that cannot match them is not offering what the scheme assumes.

Item What the guidelines say
Who you may buy from You must choose a vendor registered on the national portal (section 7). Registration is done through the state DISCOM or the national implementing agency.
The price There is no tendering or rate discovery by DISCOMs. You and the vendor agree the financial terms between you (sections 6(c) and 6(d)).
Panels Modules must be made in India from domestically made cells, and must be on the ALMM list. The guidelines call the domestic-content rule an essential condition for the subsidy (section 5(m), annexure 3).
Panel standards and output Modules must meet the IEC or equivalent BIS standards, such as IEC 61215 and IS 14286. Output should stay above 90% for the first 10 years and above 80% for the next 15, with degradation below 0.5% a year (annexure 3).
Inverter It must comply with the quality control order of 30 August 2017 and the relevant IEC or IS standards. For systems of 10 kW or less the minimum efficiency is above 90% (annexure 3).
Warranty The guidelines require the panel manufacturer’s warranty to run for not less than five years from commissioning, and the complete system to be warranted for five years from commissioning (annexures 2 and 3).
Maintenance Repairs and maintenance are free of cost for five years under a comprehensive maintenance contract (section 7(d), annexure 2).
Payment The consumer may opt for milestone-based payment to the vendor (annexure 2). MNRE and the DISCOM are not a party to any dispute between you and the vendor.
If the vendor fails Authorities can de-register a vendor or levy penalties after notice (section 7(e)). Vendor ratings are meant to be visible to consumers (section 10(d)).

The warranty and maintenance terms above are minimums. A vendor may offer more, and the guidelines allow it (section 9). We could not read the last pages of the document, so confirm any detail you rely on against the current guidelines on the national portal.

Anatomy of a good quote

A usable quote is itemised. Ask for these lines in writing, on a letterhead or in a document with the vendor’s GST number.

  1. System size in two numbers. The total panel capacity in kWp (number of panels times the watt rating of each) and the inverter capacity in kW. For example, 6 panels of 540 Wp are 3.24 kWp. A quote that says only “3 kW” hides which one it means. The subsidy is calculated on the capacity actually installed (section 6(p)).
  2. Panel make, model, wattage and count, and a statement that the panels are domestic-content and on the ALMM list.
  3. Inverter make, model and rating.
  4. Mounting structure: material, height, and whether it is a raised structure. Raised structures cost extra, as our 3 kW cost guide explains.
  5. Cables, protection and earthing, named as included.
  6. Who does the paperwork: the portal application, the net-metering request, the inspection and the commissioning report. See our net metering guide for the steps.
  7. Fees: state in the quote whether DISCOM fees are included or paid by you.
  8. GST, shown separately, with the rate and the amount.
  9. Warranty and maintenance: the years, who gives them (vendor or manufacturer), what is covered, and who you call.
  10. Timeline: the days from the date of payment to installation and from installation to net meter. The rules on delays start after the DISCOM inspects, not when the vendor finishes.
  11. Payment schedule, with each stage tied to a milestone.

Price per kWp: the number to compare

Divide each quote by its panel capacity in kWp, not by the round number in the name. Example: a quote of ₹1,86,000 for 6 panels of 540 Wp (3.24 kWp) works out to about ₹57,400 per kWp. A quote of ₹1,80,000 for 5 panels of 600 Wp (3.0 kWp) is ₹60,000 per kWp. The second looks cheaper but costs more per unit of capacity. This is our own arithmetic, not a market price. For the range of prices published in 2026, see the 3 kW cost guide.

Warning signs

  • “Subsidy included” in the price. The subsidy is paid to you after commissioning, not to the vendor. A price that already deducts it needs a written explanation of who is paying the difference.
  • The vendor does not appear on the national portal’s list. Without registration the system may not qualify for the subsidy. Check before you pay a deposit.
  • The quote does not mention domestic-content panels. A panel that does not qualify can mean a rejected subsidy claim. The panel rule changed on 1 June 2026 and reports say it raised prices, so a quote far below the others deserves a question.
  • Full payment before installation. The guidelines allow milestone payments. Our suggestion: keep the final instalment until the net meter is working and the DISCOM has commissioned the system.
  • No written maintenance. Five years of free maintenance is part of the scheme. If the quote is silent, ask for it in writing.
  • Only “3 kW” and a total. No brand, no wattage, no count, no inverter.
  • Cash or a personal account. Our suggestion: pay the registered company against a GST invoice.
  • Pressure to sign today, or a “subsidy deadline” that you cannot find on the national portal.
  • Promises of a zero bill, or a payback time with no assumptions. A fair quote explains how much your system will generate. Read our guide to payback to check the maths.

Questions to ask every vendor

  1. Are you registered on the national portal, and under which DISCOM or state?
  2. Can you show three completed installations near me, and let me speak to the owners?
  3. Who files the net-metering request, and what happens if the DISCOM sends it back?
  4. If the subsidy is rejected for a reason on your side, who bears the cost?
  5. Who do I call if the inverter fails in year three, and how fast do you attend?
  6. How do I clean and monitor the system, and is there an app?
  7. Will the vendor give me serial numbers of the panels and the inverter?

A table to compare three quotes

Copy this into a spreadsheet or print it. Fill it from the written quotes, not from phone calls.

Item Vendor A Vendor B Vendor C
On the national portal (yes or no)
Panel capacity (kWp) and inverter (kW)
Panel make, model, wattage, count
Domestic-content and ALMM stated
Inverter make and model
Price before GST, GST, total
Price per kWp (total divided by kWp)
Net metering and fees included
Warranty and maintenance (years, who)
Timeline (days)
Payment milestones
Owners I spoke to

Before you pay the last instalment

Ask for these documents, and keep copies:

  • The tax invoice with the vendor’s GST number.
  • The commissioning report and the DISCOM’s approval, which the portal also shows.
  • A photo of the net meter and its first reading.
  • The warranty cards for the panels and the inverter, with serial numbers.
  • The vendor’s maintenance commitment in writing, with a contact number.
  • Your bank details as entered on the portal, so that the subsidy arrives in the right account. If you took a loan, the subsidy goes first to the loan account (see our loan guide).

If the subsidy does not arrive, our guide to a delayed subsidy shows who to approach and in what order.

What to do next

  1. Check your state’s subsidy and DISCOM on the page for your state, and read how to apply.
  2. Register on the national portal and collect three itemised quotes.
  3. Fill the table above and ask the vendors the questions.

This guide is for information only and is not advice about any vendor. Prices and rules change, so confirm them before you pay. See our disclaimer and how we verify our numbers.

Frequently asked questions

How many solar quotes should I get?

At least three written, itemised quotes from vendors registered on the national PM Surya Ghar portal. Compare them on price per kWp and on what each includes, not on the headline total.

How do I calculate the price per kW of a solar quote?

Divide the total by the panel capacity in kWp, which is the number of panels times the watt rating of each panel divided by 1,000. A quote for 6 panels of 540 Wp is 3.24 kWp, not 3 kW.

Does the vendor have to be registered on the PM Surya Ghar portal?

Yes. The MNRE guidelines say consumers must choose a vendor registered on the national portal. Check before you pay a deposit.

What warranty and maintenance should a vendor give?

The guidelines require the system to be warranted for five years from commissioning, the panel manufacturer warranty to run for at least five years, and repairs and maintenance to be free for five years. Get it in writing.

Can I pay the vendor in stages?

Yes. The guidelines say the consumer may opt for milestone-based payment. Our suggestion is to keep the last instalment until the net meter works and the DISCOM has commissioned the system.

Is a "subsidy included" price a good deal?

Be careful. The subsidy is paid to you after commissioning, not to the vendor, so a price that already deducts it needs a clear written explanation.

Do the panels have to be made in India?

For the subsidy, yes. The guidelines require modules made in India from domestically made cells and listed on the ALMM list. A quote that does not say so may not qualify.